The pipes produced at Europipe in Mühlheim, Germany, are transported to the Mukran logistics hub by rail. Up to 90,000 pipes will be concrete weight coated and stored at Mukran Port. Every train is made up of 37 wagons and carries 148 pipes. A total of 600 trains will reach the logistics hub in Mukran.

Изображения

More than 600 trains deliver pipes to Mukran

More than 600 trains deliver pipes to Mukran

The pipes produced at Europipe in Mühlheim, Germany, are transported to the Mukran logistics hub by rail. Up to 90,000 pipes will be concrete weight coated and stored at Mukran Port. Every train is made up of 37 wagons and carries 148 pipes. A total of 600 trains will reach the logistics hub in Mukran.

JPG 300 dpi 4.9 MB 7952 px × 5304 px CMYK Загрузить 
JPG 300 dpi 4.9 MB 7952 px × 5304 px RGB Загрузить 
JPG 72 dpi 4.9 MB 7952 px × 5304 px RGB Загрузить 
Для оптимального отображения нашего веб-сайта и постоянного его совершенствования мы используем файлы Cookie. Продолжая использовать веб-сайт, вы соглашаетесь с использованием файлов Cookie. Подробная информация о файлах Cookie приведена в нашей Политике конфиденциальности. OK