Новый газопровод для обеспечения энергетического будущего Европы.

Газопровод для Европы

Энергетическая инфраструктура будущего.

Финансовые инвесторы

ENGIE
OMV
Shell
Uniper
Wintershall DEA
Impacts of Nord Stream 2 Construction in Swedish Waters were Minor, Local and Short-term

4 сентября 2020 г. | Stockholm, Sweden/Zug, Switzerland

Impacts of Nord Stream 2 Construction in Swedish Waters were Minor, Local and Short-term

The monitoring of Nord Stream 2 construction in the Swedish Exclusive Economic Zone (EEZ) show that the impacts of construction activities implemented in 2019 only had minor, local and short-term impacts to the Baltic Sea. New knowledge was obtained on higher frequency noise emanating from vessels moving in the Baltic Sea.
Опубликовано концептуальное видение устойчивого управления заказником «Кургальский»

20 июля 2020 г. | Цуг, Швейцария/Санкт-Петербург, Россия

Опубликовано концептуальное видение устойчивого управления заказником «Кургальский»

Impacts of Nord Stream 2 Construction in Finland Were in Line With or Smaller Than Assessed

10 июня 2020 г. | Helsinki, Finland/Zug, Switzerland

Impacts of Nord Stream 2 Construction in Finland Were in Line With or Smaller Than Assessed

The environmental impacts of Nord Stream 2’s construction in the Finnish Exclusive Economic Zone (EEZ) to the Baltic Sea are in line with or smaller than assessed in the Environmental Impact Assessment (EIA) and the permit application documents.
Портал экологической и социально-общественной информации

Портал экологической и социально-общественной информации

Более подробную информацию о соответствии стандартам деятельности Международной финансовой корпорации вы найдете на нашем портале экологической и социально-общественной информации.
Знакомьтесь, прораб Михаил Караваев

Знакомьтесь, прораб Михаил Караваев

За плечами прораба, работающего на строительстве участка берегового пересечения проекта «Северный поток ‑ 2», Михаила Караваева десятилетний опыт работы с монолитными конструкциями на крупных инфраструктурных проектах. Михаил рассуждает о своей роли на российском отрезке берегового пересечения газопровода, где он вместе со своей командой производит выемку грунта и заливку фундамента для технических построек.
The pipeline is being laid at a rate of up to 3 km per day

Скорость укладки газопровода по дну Балтийского моря достигает 3 км в сутки

Суда-трубоукладчики действуют как плавучие заводы: на них трубы сваривают, проверяют, а затем присоединяют к основной нитке газопровода. Поставка труб на суда точно по графику позволяет вести работу в круглосуточном режиме.

Nord Stream 2 приветствует публикацию отчета Рамсарской консультативной миссии

25 мая 2020 г. | Цуг, Швейцария/Москва, Россия

Nord Stream 2 приветствует публикацию отчета Рамсарской консультативной миссии

Компания Nord Stream 2 AG приветствует публикацию отчета Секретариата Рамсарской конвенции о Кургальском заказнике, водно-болотном угодье международного значения. Газопровод «Северный поток ‑ 2» пересекает Кургальский заказник, что требует мер по защите его уникальных экологических характеристик и сохранению биоразнообразия.
Укладка газопровода в Балтийском море — впечатления с борта Pioneering Spirit

Укладка газопровода в Балтийском море — впечатления с борта Pioneering Spirit

Поднимитесь на борт Pioneering Spirit, крупнейшего в мире трубоукладочного судна и флагмана строительной флотилии газопровода «Северный поток ‑ 2». Это уникальное судно ведет круглосуточную работу в Балтийском море, укладывая в среднем три километра труб в день.
Nord Stream delivers at full capacity

«Северный поток» работает с полной загрузкой

Действующий газопровод «Северный поток» с 2018 года работает в режиме полной загрузки. Газопровод «Северный поток ‑ 2» обеспечит дополнительные мощности для удовлетворения растущих потребностей ЕС в поставках энергии.

Natural Gas Supports Meeting Climate Targets

Natural Gas Supports Meeting Climate Targets

Flexible, efficient, and affordable, natural gas is key to supporting a climate-friendly energy transition. Our infographic illustrates its advantages.
Impacts of Nord Stream 2 Construction in Swedish Waters were Minor, Local and Short-term

4 сентября 2020 г. | Stockholm, Sweden/Zug, Switzerland

Impacts of Nord Stream 2 Construction in Swedish Waters were Minor, Local and Short-term

The monitoring of Nord Stream 2 construction in the Swedish Exclusive Economic Zone (EEZ) show that the impacts of construction activities implemented in 2019 only had minor, local and short-term impacts to the Baltic Sea. New knowledge was obtained on higher frequency noise emanating from vessels moving in the Baltic Sea.
Портал экологической и социально-общественной информации

Портал экологической и социально-общественной информации

Более подробную информацию о соответствии стандартам деятельности Международной финансовой корпорации вы найдете на нашем портале экологической и социально-общественной информации.
Знакомьтесь, прораб Михаил Караваев

Знакомьтесь, прораб Михаил Караваев

За плечами прораба, работающего на строительстве участка берегового пересечения проекта «Северный поток ‑ 2», Михаила Караваева десятилетний опыт работы с монолитными конструкциями на крупных инфраструктурных проектах. Михаил рассуждает о своей роли на российском отрезке берегового пересечения газопровода, где он вместе со своей командой производит выемку грунта и заливку фундамента для технических построек.
Опубликовано концептуальное видение устойчивого управления заказником «Кургальский»

20 июля 2020 г. | Цуг, Швейцария/Санкт-Петербург, Россия

Опубликовано концептуальное видение устойчивого управления заказником «Кургальский»

The pipeline is being laid at a rate of up to 3 km per day

Скорость укладки газопровода по дну Балтийского моря достигает 3 км в сутки

Суда-трубоукладчики действуют как плавучие заводы: на них трубы сваривают, проверяют, а затем присоединяют к основной нитке газопровода. Поставка труб на суда точно по графику позволяет вести работу в круглосуточном режиме.

Nord Stream delivers at full capacity

«Северный поток» работает с полной загрузкой

Действующий газопровод «Северный поток» с 2018 года работает в режиме полной загрузки. Газопровод «Северный поток ‑ 2» обеспечит дополнительные мощности для удовлетворения растущих потребностей ЕС в поставках энергии.

Impacts of Nord Stream 2 Construction in Finland Were in Line With or Smaller Than Assessed

10 июня 2020 г. | Helsinki, Finland/Zug, Switzerland

Impacts of Nord Stream 2 Construction in Finland Were in Line With or Smaller Than Assessed

The environmental impacts of Nord Stream 2’s construction in the Finnish Exclusive Economic Zone (EEZ) to the Baltic Sea are in line with or smaller than assessed in the Environmental Impact Assessment (EIA) and the permit application documents.
Укладка газопровода в Балтийском море — впечатления с борта Pioneering Spirit

Укладка газопровода в Балтийском море — впечатления с борта Pioneering Spirit

Поднимитесь на борт Pioneering Spirit, крупнейшего в мире трубоукладочного судна и флагмана строительной флотилии газопровода «Северный поток ‑ 2». Это уникальное судно ведет круглосуточную работу в Балтийском море, укладывая в среднем три километра труб в день.
Для оптимального отображения нашего веб-сайта и постоянного его совершенствования мы используем файлы Cookie. Продолжая использовать веб-сайт, вы соглашаетесь с использованием файлов Cookie. Подробная информация о файлах Cookie приведена в нашей Политике конфиденциальности. OK