Videos
![]() 0:00 |
![]() |
![]() 0:40 |
![]() |
![]() 1:20 |
![]() |
![]() 2:00 |
![]() |
![]() 2:40 |
![]() |
![]() 3:20 |
![]() |
![]() 4:00 |
![]() |
Connecting Pipe Sections Above Water
The Nord Stream 2 Pipeline will be built in several phases, with the two lines being laid by several ships and then welded together above the water surface at a later stage, in a two- to three-week process known as above water tie-in, or AWTI. This animation illustrates each step.
VP9 | 718x404 | 8.4 MB | Download |
VP9 (HD) | 1920x1080 | 25.7 MB | Download |
H.264 (HD) | 1920x1080 | 100.0 MB | Download |
H.264 | 718x404 | 21.2 MB | Download |
Video may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / mc-quadrat OHG.