Connecting Pipe Sections Above Water
The Nord Stream 2 Pipeline was built in several phases. The two strings were laid by several ships and then welded together above the water surface at a later stage, in a process known as above water tie-in, or AWTI. This animation illustrates each step.
Source: © Nord Stream 2 / mc-quadrat OHG
| VP9 | 718x404 | 8.4 MB | Download |
| VP9 (HD) | 1920x1080 | 25.7 MB | Download |
| H.264 (HD) | 1920x1080 | 100.0 MB | Download |
| H.264 | 718x404 | 21.2 MB | Download |
Video may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / mc-quadrat OHG.