The Nord Stream 2 Pipeline will be built in several phases, with the two lines being laid by several ships and then welded together above the water surface at a later stage, in a two- to three-week process known as above water tie-in, or AWTI. This animation illustrates each step.

Videos

0:00

0:40

1:20

2:00

2:40

3:20

4:00

Connecting Pipe Sections Above Water

The Nord Stream 2 Pipeline will be built in several phases, with the two lines being laid by several ships and then welded together above the water surface at a later stage, in a two- to three-week process known as above water tie-in, or AWTI. This animation illustrates each step.