A new pipeline for Europe’s energy future.

Videos

0:00

0:40

1:20

2:00

2:40

3:20

4:00

Connecting Pipe Sections Above Water

The Nord Stream 2 Pipeline will be built in several phases, with the two lines being laid by several ships and then welded together above the water surface at a later stage, in a two- to three-week process known as above water tie-in, or AWTI. This animation illustrates each step.

VP9 718x404 8.4 MB Download 
VP9 (HD) 1920x1080 25.7 MB Download 
H.264 718x404 21.2 MB Download 
H.264 (HD) 1920x1080 100.0 MB Download