Videos
![]() 0:00 |
![]() |
![]() 0:40 |
![]() |
![]() 1:20 |
![]() |
![]() 2:00 |
![]() |
![]() 2:40 |
Transshipment - from Kotka to Koverhar
After concrete coating, the pipes were shipped from Kotka to Koverhar, where they were stored until being laid. Pipe storage along the route allowed Nord Stream 2 to supply the materials needed in an efficient, timely and cost-effective manner, minimising impacts on the sensitive ecosystem of the Baltic Sea.
VP9 | 718x404 | 10.6 MB | Download |
VP9 (HD) | 1920x1080 | 33.3 MB | Download |
H.264 (HD) | 1920x1080 | 87.1 MB | Download |
H.264 | 718x404 | 22.9 MB | Download |
Video may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Nordisch Filmproduction Anderson + Team GmbH.