Images
Trenchbox construction method
The Russian onshore section of the pipeline passes through the Kurgalsky nature reserve. To ensure the smallest possible environmental footprint, this section is being built using an open-cut construction method. Trench boxes are deployed to reduce the width of the construction corridor and related impacts by some 50 percent.
JPG | 300 dpi | 31.3 MB | 4000 px × 2666 px | CMYK | Download |
JPG | 300 dpi | 9.8 MB | 4000 px × 2666 px | RGB | Download |
JPG | 72 dpi | 1.5 MB | 1400 px × 933 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Agiteco.