Images
The German Landfall in Lubmin, July 2020
The pipeline inspection gauge (PIG) receiving station for the Nord Stream 2 Pipeline has been operational since the end of 2019. All necessary preparations for commissioning have been completed.
JPEG | 72 dpi | 1.4 MB | 960 px × 640 px | CMYK | Download |
JPEG | 300 dpi | 414.9 KB | 960 px × 640 px | RGB | Download |
JPEG | 72 dpi | 414.9 KB | 960 px × 640 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Axel Schmidt.