On September 10, 2021, the sections of the second Nord Stream 2 pipeline laid from the German shore and Danish waters was connected in a so-called above water tie-in. The opposing pipe strings were lifted from the seabed by the lay barge Fortuna and the pipe ends were cut and fitted together. The welding to connect the two lines took place on a platform located above the water on the side of the vessel. Then the connected pipeline was lowered to the seabed as one continuous string.

Images

Pipeline lowered to seabed following above water tie-in

Pipeline lowered to seabed following above water tie-in

On September 10, 2021, the sections of the second Nord Stream 2 pipeline laid from the German shore and Danish waters was connected in a so-called above water tie-in. The opposing pipe strings were lifted from the seabed by the lay barge Fortuna and the pipe ends were cut and fitted together. The welding to connect the two lines took place on a platform located above the water on the side of the vessel. Then the connected pipeline was lowered to the seabed as one continuous string.

Source: © Nord Stream 2 / Axel Schmidt

JPEG 300 dpi 22.9 MB 4000 px × 2249 px CMYK  Download
JPEG 300 dpi 7.9 MB 4000 px × 2249 px RGB  Download
JPEG 72 dpi 1.3 MB 1400 px × 787 px RGB  Download
We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our Privacy Policy. OK