Images
Pipeline construction complete at the Russian landfall
Construction of the pipeline at the Russian landfall has been completed. With both lines laid, equipment is now being commissioned and land along the construction corridor is being reinstated.
JPEG | 300 dpi | 19.0 MB | 3840 px × 2160 px | CMYK | Download |
JPEG | 300 dpi | 5.6 MB | 3840 px × 2160 px | RGB | Download |
JPEG | 72 dpi | 983.5 KB | 1400 px × 787 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Igor Kuznetsov