PIG trap area in Narva Bay
Construction of the Pipeline Inspection Gauge (PIG) trap area, as well as the corridor for the onshore section of the Nord Stream 2 Pipeline, is progressing according to schedule.
Source: © Nord Stream 2 AG / Agiteco
| JPEG | 300 dpi | 17.3 MB | 4000 px × 2247 px | CMYK | Download |
| JPEG | 300 dpi | 5.2 MB | 4000 px × 2247 px | RGB | Download |
| JPEG | 72 dpi | 854.1 KB | 1400 px × 786 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Agiteco.