Images
Offshore installation barge Castoro 10 prepares for pipelay
The Castoro 10 (C10) assumed its starting position in the second half of June 2018 with the help of its eight anchors in the shallow waters near Lubmin. During operations, pipe segments are welded together on board the vessel and pulled ashore by a high-performance winch to connect the landfall facilities with the new offshore pipeline.
JPEG | 300 dpi | 16.9 MB | 4000 px × 2666 px | CMYK | Download |
JPEG | 300 dpi | 5.6 MB | 4000 px × 2666 px | RGB | Download |
JPEG | 72 dpi | 759.2 KB | 1400 px × 933 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Axel Schmidt.