Pipe segments welded together aboard the vessel Castoro 10 (C10) were pulled ashore to the German landfall facilities by a high-performance winch through these 700-metre-long microtunnels. Connecting the Nord Stream 2 Pipeline to landfall facilities via tunnel limits the impact on sensitive areas and leaves existing infrastructure undisturbed above ground.

Images

Microtunnels at the German landfall in Lubmin

Pipe segments welded together aboard the vessel Castoro 10 (C10) were pulled ashore to the German landfall facilities by a high-performance winch through these 700-metre-long microtunnels. Connecting the Nord Stream 2 Pipeline to landfall facilities via tunnel limits the impact on sensitive areas and leaves existing infrastructure undisturbed above ground.

JPG 300 dpi 19.0 MB 3953 px × 2635 px CMYK Download 
JPG 300 dpi 5.4 MB 3953 px × 2635 px RGB Download 
JPG 72 dpi 1.3 MB 1400 px × 933 px RGB Download 
We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our Privacy Policy. OK