Land reinstatement at the Russian landfall
Construction of the pipeline at the Russian landfall has been completed. Both lines have been laid and the trenches have been backfilled, with land reinstatement in progress along the construction corridor.
Source: © Nord Stream 2 / Igor Kuznetsov
| JPEG | 300 dpi | 25.9 MB | 4000 px × 2666 px | CMYK | Download |
| JPEG | 300 dpi | 8.6 MB | 4000 px × 2666 px | RGB | Download |
| JPEG | 72 dpi | 1.2 MB | 1400 px × 933 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Igor Kuznetsov.