Images
Installation of PIG traps at the construction site in Lubmin
Two pipeline inspection gauge (PIG) traps were installed at Nord Stream 2’s PIG receiving station in Lubmin at the end of July / early August. Special heavy transport equipment brought the traps to northern Germany. They are nearly 20 metres long and weigh about 60 tonnes each.
JPEG | 300 dpi | 20.9 MB | 4000 px × 2776 px | CMYK | Download |
JPEG | 300 dpi | 7.0 MB | 4000 px × 2776 px | RGB | Download |
JPEG | 72 dpi | 981.7 KB | 1400 px × 971 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Paul Langrock.