The entire pipeline route from Russia to Germany needs to be surveyed
A range of surveys at each stage of the project cover everything from the sea shore to depths of more than 200 metres in the middle of the Baltic Sea, so a variety of vessels and equipment is required.
Source: © Nord Stream 2 / Axel Schmidt
| JPEG | 300 dpi | 20.2 MB | 4000 px × 2666 px | CMYK | Download |
| JPEG | 300 dpi | 7.0 MB | 4000 px × 2666 px | RGB | Download |
| JPEG | 72 dpi | 1.0 MB | 1400 px × 933 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Axel Schmidt.