Images

Daily pipe delivery from Mülheim to Mukran

In October 2016 the first pipe joints for the Nord Stream 2 Pipeline were delivered from the production plant in Mülheim to the coating facilities in Mukran on the German island of Rügen. DB Cargo will transport 148 pipes a day to Mukran. Each train comprises 37 wagons carrying 4 pipes that are approximately 12 metres long and weigh about 12 tonnes.

JPG 300 dpi 22.8 MB 4000 px × 2666 px CMYK Download 
JPG 300 dpi 7.9 MB 4000 px × 2666 px RGB Download 
JPG 72 dpi 1.3 MB 1400 px × 933 px RGB Download