Construction site at the PIG receiver in Lubmin
After construction of the Pipeline Inspection Gauge (PIG) trap area was completed at the end of July / early August, the subsequent construction remains on schedule.
Source: © Nord Stream 2 / Axel Schmidt
| JPEG | 300 dpi | 20.5 MB | 4000 px × 2505 px | CMYK | Download |
| JPEG | 300 dpi | 7.2 MB | 4000 px × 2505 px | RGB | Download |
| JPEG | 72 dpi | 1.1 MB | 1400 px × 876 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Axel Schmidt.