Connecting pipe sections above water
Once the ends have been welded together, the seam is ultrasonically tested and coated. The welded pipe string is then carefully placed in a slight arc on the Baltic Sea floor.
Source: © Nord Stream 2 / Axel Schmidt
| JPEG | 300 dpi | 21.1 MB | 4000 px × 2666 px | CMYK | Download |
| JPEG | 300 dpi | 6.1 MB | 4000 px × 2666 px | RGB | Download |
| JPEG | 72 dpi | 814.5 KB | 1400 px × 933 px | RGB | Download |
Photo may be used for news reports about Nord Stream 2 if the source is credited: © Nord Stream 2 / Axel Schmidt.