Workers install cofferdams at the Russian landfall in the spring 2019. These vertical retaining walls limit the width and impact of trenches at the twin pipeline’s shore crossing, where it needs to be buried for stability and protection.

Images

Cofferdam installation at the Russian landfall

Cofferdam installation at the Russian landfall

Workers install cofferdams at the Russian landfall in the spring 2019. These vertical retaining walls limit the width and impact of trenches at the twin pipeline’s shore crossing, where it needs to be buried for stability and protection.

Source: © Nord Stream 2 / Vladimir Postnov

JPEG 300 dpi 24.6 MB 4000 px × 2661 px CMYK  Download
JPEG 300 dpi 7.6 MB 4000 px × 2661 px RGB  Download
JPEG 72 dpi 1.1 MB 1400 px × 931 px RGB  Download
We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our Privacy Policy. OK