Images

Cofferdam installation at the Russian landfall

Workers install cofferdams at the Russian landfall in the spring 2019. These vertical retaining walls limit the width and impact of trenches at the twin pipeline’s shore crossing, where it needs to be buried for stability and protection.

JPG 300 dpi 24.6 MB 4000 px × 2661 px CMYK Download 
JPG 300 dpi 7.6 MB 4000 px × 2661 px RGB Download 
JPG 72 dpi 1.1 MB 1400 px × 931 px RGB Download